Wasdell Our Clients

Project Name

Production Facility

Project Location

Dundalk,
Ireland

Project Size

3,300m²

Project Value

€1.2 million

Project Duration

4 months

Architect

OCA Architects

Engineer

Bassaire

Main Contractor

Kilcawley

Design completed using

Revit 2019
Autocad.

Sub- Contractors

Interlocking & Access Control

Cleanroom Classification

CNC 7
ISO 8

Wasdell

Production Facility Dundalk, CNC 7 & ISO 8

Wasdell Group have built a new purpose built pharmaceutical packaging plant in Dundalk, Ireland which is the company’s first facility outside the UK.

This project has enabled Wasdell to serve customers in the European pharmaceutical and healthcare sectors. It will carry out drug testing, production of primary and secondary packaging and distribution in Europe and international markets.

Products & Services Provided by Asgard in this Project

Ceilings

3300m² of 60min fi re rated walk-on ceiling panel system over the production cleanrooms. Lay-in grid ceiling in cleanroom support areas.

Doorsets

GRP door leafs with aluminium frames fully flush with wall system. Our scope also included the supply, installation and commissioning of a fire rated roller shutter.

Partitions

50mm thick aluminium honeycomb core panels ranging in height from 3m to 4m with PVC coated metal to fi nish throughout.

Fixtures

Stainless steel bollards and bumprails.