UK Project Profiles

Megalabs, Project Jupiter

Project Details

Project Name


Project Jupiter

Project Location


Royal Leamington Spa, UK

Project Size


13,500 sq.m

Project Value


£12,000,000

Project Duration


8 months

Architect


HOK

Engineer


WSP

Main Contractor


Mace and Balfour Beatty

Sub-Contractors


Interlocking

Cleanroom Classification


BSL 2 Laboratory
Project Overview
NHS megalabs

NHS

Named the Rosalind Franklin Laboratory, this Megalabs Project Jupiter in Royal Leamington Spa will be home to a new very high-volume symptomatic testing laboratory. It has become one of the largest diagnostic facilities in the UK and will play a key role in the fight against COVID-19. Publicly owned and operated by the Department of Health and Social Care (DHSC), this facility will be dedicated to COVID-19 for NHS Test and Trace and will be able to process hundreds of thousands of tests per day at full capacity. Asgard Cleanroom Solutions successfully completed the detailed design, supply, and installation of the 13,500 sq.m. BSL2 laboratory element of this project

Provided by Asgard

Products & Services

Ceilings


Plasteurop SB05 fully flush 50mm panel system

Cleanroom Walls


Middas M100 Bi-Panel system with recessed base for flush floor coving and fully flush integrated window units. The walls also provided the supporting structure to the lab roof deck, upon which the off-site prefabricated M&E modules were loaded.

Cleanroom Sliding Doors


Plasteurop fully glazed electrically automated sliding doors & control

Cleanroom Swing Doors


Middas M100 metal door system flush integrated into bi-panel wall system complete with integrated interlocking hardware and automation where necessary