UK Project Profiles

MECD – University Of Manchester

Project Details

Project Name


MECD

Project Location


Manchester

Project Size


600m²

Project Value


£300k

Project Duration


4 Months

Architect


BDP

Engineer


Arup

Main Contractor


Balfour Beatie

Design Completed Using


Revit 2019

Cleanroom Classification


ISO 6
Project Overview
The University of Manchester

University Of Manchester

The Manchester Engineering Campus Development (MECD) is a 81,000m² campus which includes state-of- the-art student spaces, teaching environments, lecture halls, laser labs (1161m²) , dry labs (8784m² ), chemical labs (2412m²), biological labs (630 m²), characterisation labs (1141m²), workshops, cleanrooms, meeting rooms, conference, food and beverage, equipment/material storage and associated public realm.

The cleanroom space based in the basement of ghe building consistent of a suite of cleanrooms to ISO 6 classification with laminar flow hoods to ISO 3 classification.

Provided by Asgard

Products & Services

Ceilings


Design and installation 600m² of walk-on ceilings with factory formed apertures and handrail to perimeter.

Partitions


Design, supply, and installation of 1000m² of bi-panel partition and single faced liner panels with recessed base and fully flush pe-formed internal and external comers. Some partitions were 30-minute fire rated.

Doorsets


Fully flush frame and vision panels with integrated concealed maglocks and traffic light system.