Project Name


ICEPS

Project Location


Leeds

Project Size


1250m²

Project Value


£1.2 million

Project Duration


8 Months

Architect


BDP

Engineer


Arup

Main Contractor


BAM

Design Completed Using


Revit 2020

Cleanroom Classification


ISO 5 & 6
Project Overview
university of leeds

Leeds University

The International Centre For Engineering and Physical Science (ICEPS) at Leeds Uni. ISO 5 cleanrooms including Joel and lithography rooms.

Asgard supplied over 1200m² of static dissipative lining and partitions and 1250m² of walk on modular ceiling to house the fan filter units, statistic dissipative epoxy sub floor and a 1000Kgf pedestal aluminium tile raised access floor incorporating solid, dampered perforated and open grate to the chase areas.

Fully glazed swing and automated sliding doors were installed including interlocks. Other elements of the project included cat ladders, stainless steel bespoke furniture and sinks.

Provided by Asgard

Products & Services

Ceilings


Modular 50mm grid system with 50mm walk-on tiles to blanked areas. Gel grid to fully filtered Joel room.

Partitions


Static dissipative sealant free lining and partition system.

Doorsets


Glazed personal and automated sliding doors.