MSD Our Clients

Project Name

Project Lion

Project Location

Brinny,
Cork,
Ireland

Project Size

1700m²

Project Value

€3.2 million

Project Duration

18 months

Architect

PM Group

Engineer

PM Group

Main Contractor

PM Group

Design completed using

Autocad 2D
Revit
Navisworks

Cleanroom Classification

BSL 2
ISO 7-8

MSD

Project Lion, BSL 2 & ISO 7-8

MSD’s vision is to make a difference to people’s lives by bringing innovative healthcare to those who need it most. This project was to three buildings, one being 3 stories high, total size of 1600m². The project included a high spec cleanrooms envelope, HEPA housings, automated sliding doors, rapid roller doors, interlocking etc.

Products & Services Provided by Asgard in this Project

Ceilings

A combination of walk on ceiling (2.5 Kn 75 mm thick) including bulkheads Integrated electrical raceways & Cleanroom metal grid ceiling comprising of HPL ceiling tiles.

HVAC

Design, supply and installation of terminal HEPA housings, low level air return walls, low level extract ducts, supply grilles and air monitoring.

Partitions

550 linear metres of 50mm thick aluminium honeycomb panels ranging in heights from 3m to 5m including glazing etc & the construction of airwalls throughout the project as required.

Furniture

Design, supply and installation of furniture including, stainless steel, Trespa, and free standing office furniture.

Doorsets

Provision of swing doors & automated sliding doors.

Interlocking

Design, supply, installation & commissioning of interlocking systems.

Electrical

Design, supply and installation of walk-on lights emergency exit signs, sockets switches and automation.

Bumprails

Provision of bollard & wall mounted stainless steel bumprails.