Project Name

Lonza NSYNC

Project Location

Visp,
Switzerland

Project Size

3,645m²

Project Value

€4 million

Project Duration

32 Weeks

Architect

Baker Hicks

Engineer

Morgan Sindell

Main Contractor

Morgan Sindall Group

Design completed using

Revit 201
Autocad

Sub- Contractors

All Electrical Works, Cleanroom Lighting, Cleanroom Door Interlocking, Cleanroom Power Utility's, STS GroupHVAC Works, E. Kalt AG & Cleanroom Utility's, ZETA GmbH

Cleanroom Classification

ISO 5-8, BSL 2

Lonza

Lonza NSYNC, BSL 2, ISO 5-8

Asgard Cleanroom Solutions successfully completed the detailed design, supply and installation of the NSYNC Cleanroom Project on the Lonza IBEX Campus in Visp, Switzerland.

Products & Services Provided by Asgard in this Project

Cleanroom Ceilings

Asgard Sterideck walk-on ceiling with 2.5kN live load capacity with integrated wireways for concealed electrical cabling.

Cleanroom Sliding Doors

Plasteurop fully glazed electrically automated sliding doors & controls.

Cleanroom Walls

Middas M100 Bi-Panel system with recessed base for flush floor coving and fully flush integrated window units.

HVAC

Fan Filter Units ​Exyte Fan Filter Units Silent & Exyte Plenum Integrated Fan Filter Units.

Cleanroom Swing Doors

Middas M100 metal door system flush integrated into bi-panel wall system complete with integrated interlocking hardware and automation where necessary.

Cleanroom Fixtures

Eye Wash & Safety Showers, Guardian GBF1250 Recessed Safety Station with Drain Pan, Exposed Shower Head Stainless steel & glass Pass Through hatches: ​PBSC Combined Material & Trolley HEPA Filtered Blowdown Pass Through Hatches and stainless steel bumprails.