IE Project Profiles

Wasdell Production Facility

Project Details

Project Name


Production Facility

Project Location


Dundalk, Ireland

Project Size


3,300m²

Project Value


€1.2 million

Project Duration


4 months

Architect


OCA Architects

Engineer


Bassaire

Main Contractor


Kilcawley

Design Completed Using


Revit 2019, Autocad.

Sub-Contractors


Interlocking & Access Control

Cleanroom Classification


CNC 7, ISO 8
Project Overview
Wasdell

Wasdell

Wasdell Group have built a new purpose built pharmaceutical packaging plant in Dundalk, Ireland which is the company’s first facility outside the UK.

This project has enabled Wasdell to serve customers in the European pharmaceutical and healthcare sectors. It will carry out drug testing, production of primary and secondary packaging and distribution in Europe and international markets.

Provided by Asgard

Products & Services

Ceilings


3300m² of 60min fire rated walk-on ceiling panel system over the production cleanrooms. Lay-in grid ceiling in cleanroom support areas.

Partitions


50mm thick aluminium honeycomb core panels ranging in height from 3m to 4m with PVC coated metal to finish throughout.

Doorsets


GRP door leafs with aluminium frames fully flush with wall system. Our scope also included the supply, installation and commissioning of a fire rated roller shutter.

Fixtures


Stainless steel bollards and bumprails.