IE Project Profiles

Regeneron Bulk Biologics Facility

Project Details

Project Name


Bulk Biologics Facility

Project Location


Raheen Bus. Park, Limerick, Ireland

Project Size


6200m²

Project Value


€16 million

Project Duration


24 months

Architect


Jacobs Engineering

Engineer


Jacobs Engineering

Main Contractor


PM Group (Managing Contractor)

Design Completed Using


Autocad 2D, Microstation, Navisworks

Cleanroom Classification


BSL 2, ISO 5-8
Project Overview
Regeneron Bulk Biologics facility

Regeneron

Work commenced on this 12,000m² project in August 2014 with the peak man-power occurring in the first quarter of 2015. The Project was completed in August 2016. After this time Asgard were requested to remove panels to enable the moving in of client equipment and subsequently reinstalled the walls. This project was constructed in an existing facility.

Provided by Asgard

Products & Services

Ceilings


11,000m² of walk-on ceilings and bulkheads. Factory formed opes for lights and grilles. 450m² non-walk-on ceiling panels.

Partitions


Fully Flush panelling system, 50mm thick to cleanrooms including 760nr fully flush windows, low-level return walls and cold weld joints. Fire rated plasterboard walls to electrical rooms.

Doorsets


Provision of 365 swing doors, 3nr rapid roll doors, 34nr pass-through hatches.

Other


Mock-up, 200nr exit signs, 2500m of guardrails, 36nr ladders and gates, 22nr 316 grade s/s fire extinguisher cabinets.

Interlocking


Design, supply, installation and commissioning of interlocking systems.

HVAC


Supply and installation of 1100Nr HEPA filter housings, filter media and grilles.

Lighting


Supply and install 2100Nr LED light fittings including 500nr emergency battery back-ups and 6Nr EEX rated fittings.