IE Project Profiles

Medtronic Cleanroom

Project Details

Project Name


Medtronic Cleanroom

Project Location


Galway, Ireland

Project Size


3,000m²

Project Value


€2,000,000

Project Duration


8 months

Cleanroom Classification


ISO 7
Project Overview
Medtronic

Medtronic

Medtronic Ireland is a global leader in medical technology, services and solutions. The Galway facility features a centre of Excellence for operations and R&D to support Global Cardiac and Vascular businesses.

This €2,000,000 project included steel support structure within the building, plenum top to support AHU’s, interior walls and aluminium ceiling system to a 2,500m² ISO Class 7 cleanroom.

Provided by Asgard

Products & Services

Ceilings


2,500m² of aluminium grid with pre-coated metal tiles.

Partitions


3,000m² of metal faced fully flush FM approved paneling 50mm thick.

Doorsets


Provision of approx 45 fire rated and non rated doorsets.

Structural


Design, supply and installation of a steel support structure which supports all of the AHU’s, M+E services, plenum and ceiling system.

Furniture


Design, manufacture and installation of recessed notice boards, magnehelic gauge panels, etc.

Interlocking


Design, supply, installation and commissioning of interlocking to 14 doorsets.

HVAC


Low-level air extract.