IE Project Profiles

Lonza NSYNC

Project Details

Project Name


Lonza NSYNC

Project Location


Visp, Switzerland

Project Size


3,645m²

Project Value


€4 million

Project Duration


32 Weeks

Architect


Baker Hicks

Engineer


Morgan Sindell

Main Contractor


Morgan Sindall Group

Design Completed Using


Revit 201, Autocad

Sub-Contractors


All Electrical Works, Cleanroom Lighting, Cleanroom Door Interlocking, Cleanroom Power Utility's, STS GroupHVAC Works, E. Kalt AG & Cleanroom Utility's, ZETA GmbH

Cleanroom Classification


ISO 5-8, BSL 2
Project Overview
Lonza

Lonza

Asgard Cleanroom Solutions successfully completed the detailed design, supply and installation of the NSYNC Cleanroom Project on the Lonza IBEX Campus in Visp, Switzerland.

Provided by Asgard

Products & Services

Ceilings


Asgard Sterideck walk-on ceiling with 2.5kN live load capacity with integrated wireways for concealed electrical cabling.

Cleanroom Walls


Middas M100 Bi-Panel system with recessed base for flush floor coving and fully flush integrated window units.

Cleanroom Fixtures


Eye Wash & Safety Showers, Guardian GBF1250 Recessed Safety Station with Drain Pan, Exposed Shower Head Stainless steel & glass Pass Through hatches: ​PBSC Combined Material & Trolley HEPA Filtered Blowdown Pass Through Hatches and stainless steel bumprails.

HVAC


Fan Filter Units ​Exyte Fan Filter Units Silent & Exyte Plenum Integrated Fan Filter Units.

Cleanroom Sliding Doors


Plasteurop fully glazed electrically automated sliding doors & controls.

Cleanroom Swing Doors


Middas M100 metal door system flush integrated into bi-panel wall system complete with integrated interlocking hardware and automation where necessary.