GSK Patch

Project Details

Project Name


GSK Patch

Project Location


Dungarvan, Waterford, Ireland

Project Size


1,500m²

Project Value


€1 million

Project Duration


4 months

Architect


DJF Engineering

Engineer


DJF Engineering

Main Contractor


Sisk

Design Completed Using


Autocad

Cleanroom Classification


BSL 2, ISO 5-8
Project Overview
GSK Patch

GSK

Asgard completed the design, supply and installation of this 1,500m² Cleanroom, which included aluminium rapid roller doors, hermetically sealed sliding doors, aluminium honeycomb walk on ceilings and walls. Cleanroom Envelope construction was completed in a very fast twelve week period from commencement to meet clients requirements.

Provided by Asgard

Products & Services

Ceilings


1,500m² of aluminium honeycomb walk-on ceiling panels.

Partitions


2,000m² of flush metal faced panelling system 50mm thick.

Doorsets


Provision of approx 30 doors including rapid action doors, hermetically sealed sliders, and various hinged doorsets.

Electrical


Design, supply and installation of recessed stainless steel service panels, automation of sliding and rapid roller doors and their interlocking.

Interlocking


Design, supply, installation and commissioning of interlocking systems.