IE Project Profiles

GSK Hilo

Project Details

Project Name


GSK Hilo

Project Location


Dungarvan, Waterford, Ireland

Project Size


2,000m²

Project Value


€1.4 million

Project Duration


7 months

Architect


GSK

Main Contractor


Duggan Brothers Ltd.

Design Completed Using


Autocad

Cleanroom Classification


ISO 7-8
Project Overview
GSK Hilo

GSK

Asgard completed the design, supply and installation of this 2,000m² Cleanroom over four levels, which included the high specification Cleanroom Envelope, with some electrical elements, HVAC grilles, Structural elements, and fire rated walls to lift shafts. Cleanroom Envelope construction was completed in a very fast four month period from commencement of fit out.

Provided by Asgard

Products & Services

Ceilings


2,000m² of walk-on ceiling panels.

Partitions


4,000m² of flush metal faced panelling system 50mm thick.

Doorsets


Provision of approx 70 doors including rapid action doors, hermetically sealed sliders, and various hinged doorsets.

Electrical


Design, supply and installation of recessed stainless steel service panels, automation of sliding and hinged doors and their interlocking.

Furniture


Design, manufacture and installation of various items of stainless steel furniture.

Interlocking


Design, supply, installation and commissioning of interlocking systems.