IE Project Profiles

BMS Cleanroom LSCC

Project Details

Project Name


BMS LSCC

Project Location


Dun Laoghaire, Dublin

Project Size


12,400m² over 2 floors

Project Value


€25 million

Project Duration


17 months

Architect


Jacobs Engineering Ltd

Engineer


Jacobs Engineering Ltd

Main Contractor


Jacobs Engineering Ltd

Design Completed Using


Revit, Navisworks

Cleanroom Classification


BSL 2, ISO 5-8
Project Overview
BMS Cleanroom LSCC

BMS

BMS LSCC was the largest contract awarded to Asgard. Asgard successfully completed the construction of the cleanroom and were awarded the laboratory project on the same site. For BMS LSCC project Asgard provided a complete cleanroom envelope.

Provided by Asgard

Products & Services

Ceilings


10,000m² of PVC coated metal faced, aluminium honeycomb core, walk-on ceilings and bulkheads.

Partitions


15,000m² of 50mm PVC coated metal faced, aluminium honeycomb core, fully flushed panelling system to cleanrooms including fully flush windows. 3,000m² of PVC liner panels mounted on plasterboard walls.

Doorsets


Provision of 170 fully flush swing doors, 33 rapid roll doors (18 of which are fire rated). Supply, installation and commissioning of interlocking systems to 44 separate interlocks.

Electrical


Design, supply & installation of walk-on light fittings door automation.

Floorsets


11,300m² of MC-DUR trowel applied cleanroom flooring with coved up-stands and antistatic cleanroom flooring.

Furniture


Design, supply and installation of phenolic resin change room furniture along with stainless steel sink units, step-over benches and cleanroom furniture and ancillaries.

HVAC


Design, supply & installation of terminal HEPA housing, low-level air return walls, supply grilles and 3 LAFs.

Protection


Floor mounted S/S bumprails & bollards and wall mounted S/S bump guards and corner guards.

Design


Complete co-ordinated detail design of all cleanroom areas; including fabrication, site-delivery, installation and commissioning. Integrated lighting, ventilation, power/data distribution and piped service transfer accommodation within the clean GMP envelope.