IE Project Profiles

Amgen TVEC Laboratory

Project Details

Project Name


TVEC Laboratory

Project Location


Dun Laoghaire, Dublin

Project Size


525m²

Project Value


€400,000.00

Project Duration


3 months

Architect


RKD Architects

Engineer


Callaghan Engineering

Main Contractor


Amgen Direct

Design Completed Using


AutoCAD 2D

Cleanroom Classification


BSL 2
Project Overview
Amgen TVEC Laboratory

Amgen

Amgen Dun Laoghaire is a 37,000m² aseptic operations facility, specialising in secondary manufacturing activities: formulation, filling and lyophilisation of syringe and vial products.

Asgard completed the design and installation of this modern day laboratory. It comprises a fully glazed wall system complete with glazed doors to provide a high spec eye catching finish to the concept.

Provided by Asgard

Products & Services

Ceilings


525m² of lay-in metal tile & grid system.

Partitions


275m² of glazed partition systems incorporating a cleanroom head panel & connection mullion on all sides of the glazing. A 50 mm metal faced fully flush panelling system was also used to construct specific rooms internally.

Doorsets


2 nr fully glazed double door sets & 1 nr glazed emergency escape door.

Other


Supply & install free standing emergency safety.

Floorsets


525m² of Tarkett IQ Toro SC antistatic flooring in various colours.

Furniture


525m² of Tarkett IQ Toro SC antistatic flooring in various colours.