Bollorè – Blue Solutions 2003-2005

Project Details
bollore

Project Name


Bollorè Blue Solutions

Project Location


Brittany, France

Project Size


5000m² / Phase 1 - 2000m² Phase 2 - 3000m²

Project Value


€12.5 million

Project Duration


Phase 1 - 6 months Phase 2 - 6 months. Turnkey Project

Cleanroom Classification


ISO 7, 8

Dew Point


-30 Degrees C

RH


Range between 5%-75%
Project Overview
bollore

Bollorè – Blue Solutions 2003-2005

We provided Turnkey design assist at an early concept stage, taking this project into data led design and construction. Some of the features of this project included: 

  • Design & Build Dry/Clean Rooms and Cleanrooms
  • Firewalls – 120 minute & 60 minute
  • Dry Room System
  • FFU Filter Ceiling
  • Airlocks
  • All Door Requirements
  • All Wall Protection