Abbott Project Profiles

Project Name

Project Wyoming

Project Location

Longford,
Ireland

Project Size

1,800m²

Project Value

€2 million

Project Duration

5 months

Architect

Taylor Group

Engineer

Concannon Healy Heffernan

Main Contractor

John Paul Construction

Design completed using

Autocad

Sub- Contractors

Terrazo Flooring,
RRD,
Interlocking,
S/S Furniture.

Cleanroom Classification

ISO 8
CNC

Abbott

Diagnostics Longford, ISO 8 & CNC

The Longford facility plays a key role in helping Abbott to meet the increasing global demand for diagnostic testing in areas such as infectious disease, cancer, thyroid and cardiovascular diseases.  

This project consisted of 1800m² Cleanroom including Walk-on ceilings, Wall Panels, Doors, RRDs, Flooring and associated items in Longford. Wall panels have been designed demountable for future facility changes. 

Products & Services Provided by Asgard in this Project

Ceilings

Plasteurop Walk on Ceiling (SBM07) Grid (Armstrong).

Flooring

Terrazo, Mipolam and Epoxy Flooring.

Partitions

Plasteurop Rockwood core - PET SB05. Plasterboard with skim finish with cleanroom lining.

Lighting

Astra Lighting.

Doorsets

Steel Doors (Plasteurop) Effaflex RRDs.

Protection

Floor mounted S/S bumprails & bollards and wall mounted S/S bumpguards and corner guards.

Electrical

Automation and interlocking.