wyeth
wyeth

Wyeth, Dublin, Ireland

Contract Summary

Asgard work on this project was to design, supply and install 22,000m2 of metal panel ceiling systems. The value of this project to Asgard was €2,200,000.

Scope of works

  • Ceilings – 22,000m2 of various types of ceilings which were broken into 8,000m2 of MF ceilings, 9,000m2 of SAS metal ceilings and 5,000m2 of Armstrong Mylar ceilings
  • Structural – Design, supply and installation of a subgrid structure above entire ceiling which was coordinated with all HVAC, electrical and process services

download-pdf-button