Contract Summary
In September 2004, Asgard completed the design, supply and installation
of this 600 square metre cleanroom envelope which included the
flooring, partitions, ceilings, lighting, HVAC grilles and glass
sliding doors.
Scope of works
Ceilings – 600 square metres of metal pan non walk-on ceiling tiles
Partitions – 1,000 square metres of metal faced fully flush FM approved
panelling 50mm thick
Doorsets – Provision of approx 20 fully flush non rated doorsets, 10
fire rated units and 4 3.0x2.4m glass sliding doorsets
Interlocking – Design, supply, installation and commissioning of
interlocking to 6 doorsets including automation to 2 doorsets
Furniture – Design, manufacture and installation of stainless steel
change room furniture
Structural – Design, supply and installation of a subgrid structure
above entire ceiling including integrated handrails to perimeter and
walkways over ceiling
HVAC – Supply and installation of supply and extract grilles
Miscellaneous – Light fittings, hose reels, sinks and wash hand basins
were all supplied and installed by Asgard
|