GSK Patch, Dungarvan, Ireland

Contract Summary

Asgard completed the design, supply and installation of this 1,500m2 Cleanroom, which included aluminium rapid roller doors, hermetically sealed sliding doors, aluminium honeycomb walk on ceilings and walls. Cleanroom Envelope construction was completed in a very fast twelve week period from commencement to meet clients requirements.

Scope of works

  • Electrical – Design, supply and installation of recessed stainless steel service panels, automation of sliding and rapid roller doors and their interlocking.
  • Ceilings – 1,500m2 of FM aluminium honeycomb walk on ceiling panels.
  • Partitions – 2,000m2 of flush metal faced fully flush panelling system 50mm thick
  • Doorsets – Provision of approx 30 doors including rapid action doors, hermetically sealed sliders, and various hinged doorsets.
  • Interlocking – Design, supply, installation and commissioning of interlocking systems.

download-pdf-button