Contract Summary
Between May 2008 and May 2009,
Asgard have completed the design, supply and installation of €3million
of cleanroom
envelope components at the above site, consisting of 5,000m2 of
cleanroom space, which included the high specification
cleanroom
envelope, with some Electrical elements, HVAC grilles, Structural
elements, etc. Project was completed in three very short installation
phases.
Scope of works
•
Electrical -
Design, supply and installation of recessed stainless steel service
panels, automation of rapid roller doors, sliding and
hinged doors and their interlocking.
•Ceilings – 4,500m2 of aluminium
honeycomb walk on ceiling panels.
• Partitions – 5,500m2 of flush
metal faced fully flush panelling system 50mm thick.
500m2 of glass walls to viewing corridors.
•
Doorsets – Provision of approx 40 rapid action doors, 10 haremetically
sealed sliding doors, and 30 fully flush hinged doorsets.
• Interlocking – Design, supply,
installation and commissioning of various complex interlocking systems.
•Flooring- Many types of
flooring supplied such as mipolam vinyls.
• Furniture – Design,
manufacture and installation of stainless steel furniture including
many items within the cleanroom areas.
|