This project required the fit out of 2800m2 of Laboratory space over two levels using our high-performance HPL panelling system including single and double doors with a complete interlocking system as required by the client.

Partitions – 1450m2 50mm HPL Rockwell core cleanroom grade wall Panels.

Doorsets – Supply and installation of 50mm fully flush HPL single and double doors.

Interlocking – Design, supply, installation and
commissioning of interlocking.

  • Project Name: BMS Laboratories
  • Project Size: 2800m2
  • Project Value: €1.0 million
  • Project Duration: 5 months
  • Client: Bristol-Myers Squibb Ireland
  • Architect: Jacobs
  • Engineer: Jacobs
  • Main Contractor: Jacobs
    Outline Scope:
    Supply of HPL Panels
    HPL Doors & Interlocking
    Design completed using:
    Revit 2016
    Navisworks