Contract Summary
This negative pressure tablet
manufacturing and coating facility includes a number of 6.7m high
rooms, low level extract ducts
and stainless steel service panels.
Scope of works
•
Ceilings – 1,900m2 of fully flush long-span walk-on plank ceiling panels
• Partitions – 2,500m2 of metal
faced fully flush FM approved panelling 50mm thick
• Doorsets – Provision of approx
35 fully flush non rated doorsets and 10 fire rated units
• Interlocking – Design, supply,
installation and commissioning of interlocking to 6 doorsets
• Furniture – Design,
manufacture and installation of an integrated step over bench
•
Structural – Design, supply and installation of a subgrid structure
above entire ceiling including integrated handrails to perimeter
• HVAC – Low level cleanroom
panelled extract ducts
• Miscellaneous – Stainless
steel service plates and magnetic service panels
|