Contract Summary
This €900k project was completed
in October 2003 in a live plant and
included rooms of various heights up to 6.0m. The interlocking of
doorsets on this project was particularly
challenging due to the fact that there were hinged GRP, sliding GRP and
rapid roll doors interlocked together.
Scope of works
•
Ceilings – 1,600m2 of fully flush long-span walk-on plank ceiling panels
• Partitions – 2,000m2 of metal
faced fully flush FM approved panelling 50mm thick
• Doorsets – Provision of approx
10 GRP doorsets, 2 sliding GRP doors and 5 rapid roll doors
• Interlocking – Design, supply,
installation and commissioning of interlocking to 8 doorsets including
a 5 door arrangement
• Furniture – Design,
manufacture and installation of stainless steel step over bench
•
Structural – Design, supply and installation of a subgrid structure
above entire ceiling including integrated handrails to perimeter
• HVAC – Cleanroom panelled low
level extract ducts
• Miscellaneous – Light fittings
were also supplied and installed by Asgard
|